All photos in this gallery were taken by Kinergetics staff and represent actual project work.

  • Power Factor Correction and Compressor Power
  • RTO Heat Recovery
  • Scrubber Exhaust Heat Recovery Coil
  • Scrubber Makeup Water for Dryer Investigation
  • Shear Plates for Thermal Expansion
  • Stillage Evaporator Liquid Distribution Optimization
  • Sulfur Burner Exhaust Duct
  • Treated MSW During Process Due Diligence
  • Tubesheet for RTO Heat Exchanger
  • Ultrasonic PC Flow Testing RTO Heat Recovery
  • Upper Midwest Wind Farm at Sunrise
  • Failed Seals on Flash Tank Pump
  • Vent Heat Loss Testing
  • Viscosity Testing for Syrup Heater Design
  • 30,000 SCFM Turning Vane
  • Ammonia Flow Testing
  • Baffle Plate for RTO Heat Recovery
  • Metal Casting
  • Creative Pulp Refiner Seal Water Metering
  • Electric vs Hydraulic Molding Press
  • Evaporator Distribution Pan
  • Evaporator Tube Fouling Evaporator Optimization
  • Evaporator Vacuum Steam Ejector Replaced During Optimization
  • Excessive DA Venting
  • Exchanger Being Prepared for Reuse
  • Exchanger Inlet Cone
  • Failed Thermostatic Vent
  • Fermentation Pump Optimization and Commissioning
  • Flash Steam Recovery Investigation
  • Flow Testing
  • Heat Exchanger RTO Heat Recovery
  • Heat Pipe to be Refurbished for Oven Heat Recovery
  • Heat Transfer Tube Testing
  • Heat Treat Furnace
  • Low Temperature Waste Heat Recovery
  • Low Temp Waste Heat Recovery Commissioning
  • MSW To Energy Concept Validation
  • Orbital Tube Welding
  • Parts Washer Efficiency Investigation
  • Parts Washer Exhaust Heat Loss
  • Poor Use of Condensate for Heat Tracing
  • Powder Cooler Upgrade
  • Asphalt Plant & Cure Oven Flow Testing
  • Asphalt Plant Heat Recovery Investigation
  • Severe Falling Film Evaporator Fouling Due to Poor Distributor Design

Copyright Kinergetics. Please call 608.442.5690 for permission to use photos.